Our Projects |
|
|
|
No |
Description |
Contract Value |
Year of Completion |
1 |
Upgrading of 4 pumping stations including
surge analysis, sump model tests and ancillary equipment |
S$2,755,100 |
1997/1998 |
2 |
Kim Chuan STW - 6 sets DAFT (Dissolved Air
Flotation Thickeners) capacity 360m3 /hour
Main Contractor: Dayen Environmental Ltd
Owner: Public Utilities Board, Singapore |
S$2,053,600 |
Dec 2001 |
3 |
M&E Works at Sentosa Cove - Various pumping
stations
Main Contractor: Lee Hong Construction
Owner: Sentosa Development Corporation |
S$679,365 |
Dec 2001 |
4 |
Design, Supply, Installation & Commissioning
of Polymer Make-Up System at Chestnut Ave & Choa Chu Kang
Waterworks. Polymer is used as an aid in thickening and dewatering
process in the treatment plants
Main Contractor: Salcon Ltd
Owner: Public Utilities Board, Singapore |
S$926,388 |
Jan 2002 |
5 |
Design, fabricate, supply 10 sets of Polymer
Make-Up systems at Ulu Pandan Water Reclamation Plant - The
preparation system are to facilitate thickening and dewatering
process
Main Contractor: Sembcorp E & C
Owner: Public Utilities Board, Singapore |
S$993,720 |
Nov 2001 |
6 |
Upgrading of M&E Equipment at Paya Lebar
Pumping Station - One of the biggest pumping station in Singapore.
There are 5 pumps each 700L/S capacity with HT 6.6KV motor
of 450KW. Each disintegrator has capacity of 1511L/S. The
works also include surge suppression system, vibration studies
and monitoring system, sump model test.
Owner: Public Utilities Board, Singapore |
S$3,290,000 |
Feb 2002 |
7 |
Supply & Installation of Air-Cooled Condenser
Fans at Tuas Incineratin Plant - ENV
Owner: Tuas Incineration Plant |
S$728,000 |
Nov 2001 |
8 |
Supply and installation of 4 nos. Silo Bins
each 500m3 ca pacities at Seletar STW - The design
and construction of these sludge storage facilities are to
receive the dewatered sludge before disposal or incineration
Main Contractor: Hyundai E&C
Owner: Public Utilities Board, Singapore |
S$640,000 |
Aug 2002 |
9 |
Phasing out of STPS at Lornie Road/Adam Drive
in Marina Basin Catchment - Ah Boon Civil Engineering &
Bldg Contractors Pte Ltd
Owner: Public Utilities Board, Singapore |
S$190,000 |
Jul 2001 |
10 |
Design, supply and installation of Dewatered
Conveyor System at Bedok STW - Dayen Engineering Pte Ltd
Owner: Public Utilities Board, Singapore |
S$172,000 |
Dec 2001 |
11 |
Supply, installation, testing and commissioning
of Mechanical Ventilation systems at Loyang
Main Contractor: Deltafield Holding Pte Ltd
Owner: Public Utilities Board, Singapore |
S$350,000 |
Feb 2003 |
12 |
Design, Fabricate, install and painting of
2 nos. silo bins each 250m3 capacities at Kim Chuan
STW
Main Contractor: Dayen Environmental Ltd
Owner: Public Utilities Board, Singapore |
S$350,000 |
Nov 2002 |
13 |
Upgradig of Holland Road Pumping Station -
Design, supply, install, test and commissioning M&E Equipment
in the pumping station
Owner: Public Utilities Board, Singapore |
S$2,878,339 |
Mar 2005 |
14 |
Jurong WRP Contract 4 - Design and build 2
set DAFT, Polymer Preparation System
Main Contractor: Dayen Environmental Ltd
Owner: Public Utilities Board, Singapore |
S$1,155,000 |
May 2004 |
15 |
Pumping Station Tembusu Ave, Jurong Islang
Mechanical & Electrical Equipment
Main Contractor: Planar One Associates P/L
Owner: Jurong Town Corporation |
S$1,652,134 |
Dec 2005 |
16 |
Upgrading of Pepys Pumping Station
Owner: Public Utilities Board, Singapore |
S$1,313,000 |
Dec 2003 |
17 |
Design, supply, install, test and commission
M&E Equipment at Tengah Pumping
Owner: Public Utilities Board, Singapore |
S$966,000 |
|
18 |
Polymer Preparation System at Port Dickson
Lancang (Melaka), Hilir Perak (Perak) |
S$300,000 |
Sep 2003 |
19 |
Jurong WRP Contract 3 - Design, build 20m
diameter vertical raised Gas holder with gas storage capacity
3,400m3. The methane gas is produced from anaerobic
digester andstored in gas holder. The gas from gas holder
is used to fuel the dual fuel generators which power the treatment
plant
Main Contractor: Sembcorp Engineers and Constructors Ltd
Owner: Public Utilities Board, Singapore |
S$483,000 |
Apr 2004 |
20 |
Supply of 2 sets Polymer Preparation System
at Sungai Semenyih - The design of the polymer preparation
with bulk storage capacity is used in the sludge dewatering
facilities of the water treatment plant
Main Contractor: Chemical Waste Management, Malaysia |
S$145,000 |
May 2004 |
21 |
Upgrading Pulau Saigon Pumping Station - The
works comprise of design, supply, install, test and commission
plant equipment, electrical switchboard, surge suppression
system, vibration studies and monitoring sump model tests
Owner: Public Utilities Board, Singapore |
S$1,996,000 |
Jan 2004 |
22 |
Kim Chuan WRP - Design and build 12 nos. Primary
and Final Clarifiers and other M&E Works in the waster
water treatment. 8 nos. primary clarification facilities and
4 nos. final clarifications before being sent to dissolved
air flotation thickeners (DAFT) for thickening. The sludge
from DAFT is sent to digester and part as Returned Activated
Sludge (RAS)
Owner: Public Utilities Board, Singapore |
S$2,537,380 |
Dec 2004 |
23 |
NEWater Pipeline and in-line Booster pump
Facility to serve Loyang and Changi North Areas
Owner: Public Utilities Board, Singapore |
S$590,800 |
Dec 2005 |
24 |
Improveent Works at Bedok WRP - Ah Boon Civil
Engineering & Bldg Contractors Pte Ltd
Owner: Public Utilities Board, Singapore |
S$306,000 |
Jul 2005 |
25 |
Upgrading of Tanjong Penjuru Pumping Station
- The works includes pumps screens, hydraulic operated inlet
penstocks, valves, electric hoists, designing ventilation
system & odour control system, surge analysis and sump
model test
Owner: Public Utilities Board, Singapore |
S$1,054,000 |
Jan 2006 |
26 |
Upgrading of Penjuru Pumping Station - The
works comprise of construction of new electrical substation,
the design, manufacture, supply, installl, test and commission
plant equipment including surge suppression measures, vibration
studies, vibration monitoring and sump model test
Owner: Public Utilities Board, Singapore |
S$1,854,000 |
Feb 2006 |
27 |
Sungei Kinta - 2 Sets Polymer and 2 sets Fluoride
Preparation System.
Main Contractor: Salcon Engineering S/B |
S$155,300 |
Jan 2005 |
28 |
Replacement of Ejector system, drainage pump
and vertical turbine pump at Singapore Changi Airport
Owner: Civil Aviation Authority of Singapore |
S$128,000 |
Nov 2006 |
29 |
Design, and Build Lime Preparation and Dosing
for Ulu Pandan Newater Factory - This is a fast track contract
of 5 months including civil works. this plant is capable of
handling the lime dosing of 146 millions litres per day capacity.
The Newater plant belongs to Keppel Seghers Engineering |
S$2,182,000 |
Feb 2007 |
30 |
Effluent storage tank at Kranji Newater Factory
- The works also involve underground pipe laying |
S$478,000 |
May 2007 |
31 |
Keppel Marina Pumping Station - Design new
pumping station including equipment, surge suppression system,
vibration studies and monitoring system. |
S$660,000 |
Jun 2007 |
32 |
Design, supply, installation, testing &
commissioning of an Industrial Water Tank and Pumping Facility
at Terminal 2, Singapore Changi Airport |
S$450,000 |
Apr 2008 |
33 |
Proposed Greasy Waste Receiving Facilities
at Jurong WRP |
S$1,980,000 |
Apr 2008 |
34 |
Proposed Odour Treatment Plant to Existing
Sewage Pumping Stations for North Sentosa Cove |
S$1,025,000 |
Apr 2008 |
35 |
Proposed Gateway Avenue Roadwork for Resorts
World at Sentosa |
S$3,175,568 |
Jun 2008 |
36 |
Sewer Rehabilitation in Various Pumping Stations
catchments - Contract 8 |
S$8,583,110 |
Jan 2009 |
37 |
Proposed Punggol Reservoir: Dams, Gates, Dredging
and Ancillary Works, Contract 1 |
S$1,421,000 |
Apr 2009 |
38 |
Construction of an Abstraction Pond and ancillary
facilities at Gambas Avenue |
S$1,350,000 |
Sep 2009 |
39 |
Westech Mixing Equipment at Bunus & Pantai
- Malaysia
Main Contractor: Hitachi Plant |
US$1,240,000 |
Dec 2005 |
40 |
Supply of Grit Basin Equipment at C3C
Owner: Public Utilities Board, Singapore |
US$248,400 |
Sep 2005 |
41 |
Construction of STW, Phase 1, Package 3 -
Kuala Sawah, Damasara and Sunggala, Malaysia - Design, supply,
installation, testing and commissioning of 8 set WesTech clarifiers,
2 sets Grit Removal Equipment and 20 sets of Polymer Feeder |
US$1,358,600
RM$1,172,000 |
May 2008 |
|
|